Import new orders
Fetch fresh SOs from ERP daily. Break each new order into subassemblies and route hours to create its Production Ticket.
Constraint-based Production Capacity
Every machine. Every team. Every bay. Reassess completion dates daily against the work remaining and the capacity available—then commit with a plan you can explain.
Model your factory. Not an average factory.
Define your own machine types, subassemblies, groups, operations and route hours. Bind the work to the skills and physical resources capable of performing it.
Testing and finishing can be configured as subassembly-like stages in the machine build.
Match the work required to the capacity that can actually deliver it.
Route hours roll up from operations and subassemblies to each machine. The production mix determines the load by skill, operation and bay.
MHC = route man-hours completed.
Shift manpower and skills establish capacity. Historical absence allowances reduce it upfront; approved overtime adds capacity where planned.
A spare hour in one bay is not automatically a usable hour in another.
Machines stay in their slots. Teams move the work forward.
Illustrative sequence. Operations and teams are configured for each OEM.
Each team finishes its operation and moves to the next eligible machine. The next team takes over only when preceding work allows it.
Different work content creates two realities: a machine waiting for a team, or a team waiting for a machine to become ready.
Turn incoming demand into a structured production load.
Fetch fresh SOs from ERP daily. Break each new order into subassemblies and route hours to create its Production Ticket.
Review MHR, completed MHC, pending work, completion percentage, bay and slot allocation, dates and recorded delays.
Use customer need dates to establish priority, while physical availability and team capacity determine feasible start dates.
Keep the floor stable—or deliberately reset the plan.
Explore the alternatives. Confirm the commitment.
Run the plan manually or on a daily schedule. Adjust capacity, machine priorities or holds, then compare the forecast end date of every SO across scenarios. Confirm one option as the firm plan.
| Production order | Base capacity | Approved OT | Transfer between bays |
|---|---|---|---|
| SO-101 · Assembly A | 18 Nov | 16 Nov | 15 Nov |
| SO-102 · Assembly B | 21 Nov | 19 Nov | 23 Nov |
| SO-103 · Assembly C | 25 Nov | 23 Nov | 24 Nov |
Base plan: the current workload exceeds available capacity in this illustrative planning window.
Illustrative outcomes only—not a live scheduling calculation. Confirming here updates this page’s sample plan.
Run when the planner needs an answer, or schedule a regular daily run.
Test overtime, manpower transfers, holds and changes in machine priority.
Configure Net Change to run and confirm automatically where the organization chooses this operating mode.
Add approved capacity. Then reassess delivery.
Review MHR versus MHA for the day or forecast week.
Specify people, hours and the from/to dates and times.
Only approved overtime contributes to available MHA.
Recalculate through Net Change and confirm the revised Sandbox plan.
Move capacity where it matters. See the trade-off.
Respond to an urgent machine by deploying manpower from one bay to another. CPC reflects the reduction in source-bay capacity and the increase in the receiving bay.
The receiving work can accelerate while the source work slows. Compare both effects in Sandbox before choosing the plan.
The forecast must reflect both sides of the decision.
One confirmed plan. Two practical views.
See the SO in each slot, completion rings, empty slots and bay-level MHA/MHR.
Sample view · No illustrative plan confirmed
View SOs by planned start or forecast FG date, with weekly MHA/MHR comparisons.
Sample view · No illustrative plan confirmed
Today’s completed work becomes tomorrow’s planning reality.
Update completed SAs against each SO every day. Completion percentage and MHC establish the remaining workload for the next morning’s run.
Understand the causes without counting the delay twice.
Record material, quality, engineering and other downtime causes against the machine to explain lost progress.
Apply the historical absence allowance upfront in MHA. Record daily excess absenteeism for review and analysis.
Hold or resume a machine, or bring planned work forward or move it back. Evaluate the revised queue in Sandbox.
Choose where production is managed. Keep capacity planning connected.
Use ERP production orders with SA breakdowns and route-hour masters. Record daily production completion in ERP.
CPC reads the updates, computes opening pending MHR and forecasts against its configured resources and constraints.
When the ERP does not provide the required production detail, configure the SA structure and route hours and record daily completion directly in CPC.
Production Tickets, capacity planning, daily monitoring, downtime and management review remain together in the module.
Turn the forecast into decisions and accountable action.
Review expected monthly completions and the invoice value of those machines. Examine delays and their causes, then assign specific actions to departments against each SO.
Track those actions through completion, keeping the discussion tied to the machine and the delivery outcome.
Sample values and actions for illustration.
A complete daily planning cycle.
Configure the factory. Load the demand. Compare the alternatives. Confirm the plan. Measure the progress. Reassess tomorrow.
From machine-level route hours to team movement, from overtime approval to monthly completion forecasts—Falco CPC connects planning and production reality in one working cycle.