Production capacity.
Grounded in reality.

Constraint-based Production Capacity

Every machine. Every team. Every bay. Reassess completion dates daily against the work remaining and the capacity available—then commit with a plan you can explain.

Work remainingSO → Subassembly → Operation
→
Real-world constraintsSkills · Shifts · Bays · Slots · Sequence
→
Completion forecastCompare → Confirm → Monitor
01 / CAPACITY

Resource Planning ↗

Configure the factory as it works.

02 / SCHEDULING

Production Runs ↗

Net Change or a full regeneration.

03 / SIMULATION

Sandbox ↗

Compare options before committing.

04 / EXECUTION

Production Monitoring ↗

Actual progress informs the next plan.

CPC / Discrete production

Capacity Planning

Model your factory. Not an average factory.

Masters establish the operating reality

Define your own machine types, subassemblies, groups, operations and route hours. Bind the work to the skills and physical resources capable of performing it.

✓Machine eligibility by floor and bay, with alternative bays ranked by preference.
✓Bay capabilities, slot availability and operation sequences.
✓Manpower by shift, floor, bay, group, operation and skill.
The planning foundation
Machine type
Subassembly / part number
Group → Operation
Route hours + Required skill

Testing and finishing can be configured as subassembly-like stages in the machine build.

CPC / Discrete production

Man-Hour Planning

Match the work required to the capacity that can actually deliver it.

Demand / MHR

Man-Hours Required

Route hours roll up from operations and subassemblies to each machine. The production mix determines the load by skill, operation and bay.

Total MHR − Completed MHC
= Pending MHR

MHC = route man-hours completed.

Supply / MHA

Man-Hours Available

Shift manpower and skills establish capacity. Historical absence allowances reduce it upfront; approved overtime adds capacity where planned.

Available capacity
at the right operation

A spare hour in one bay is not automatically a usable hour in another.

A total capacity figure is only the beginning. CPC considers where the work can happen, who can perform it, and which operation must finish first.
CPC / Discrete production

Operation Scheduling

Machines stay in their slots. Teams move the work forward.

Illustrative team movement
Slot 01Slot 02Slot 03
Fitting
Complete
Complete
Team A →
Welding
Complete
Team B →
Waiting
Electrical
Team C →
Waiting
Waiting

Illustrative sequence. Operations and teams are configured for each OEM.

The bottleneck moves with the mix

Each team finishes its operation and moves to the next eligible machine. The next team takes over only when preceding work allows it.

Different work content creates two realities: a machine waiting for a team, or a team waiting for a machine to become ready.

Forecasts consider team loading and movement between slots, not simply the sum of route hours.
CPC / Discrete production

Production Orders

Turn incoming demand into a structured production load.

01

Import new orders

Fetch fresh SOs from ERP daily. Break each new order into subassemblies and route hours to create its Production Ticket.

02

Inspect each machine

Review MHR, completed MHC, pending work, completion percentage, bay and slot allocation, dates and recorded delays.

03

Queue by requirement

Use customer need dates to establish priority, while physical availability and team capacity determine feasible start dates.

Material readiness also matters. CPC uses ERP material lead times in start-date planning and lets the planner revise MCD as conditions change.
CPC / Discrete production

Production Scheduling Runs

Keep the floor stable—or deliberately reset the plan.

DAILY PLANNING

Net Change Run

  • Introduce new SOs and requeue planned machines by customer requirement dates.
  • Preserve machines already physically on the floor in their assigned bays.
  • Use opening pending MHR and team loading to forecast when slots become available.
  • Consider alternative eligible bays where the required skills and capacity are available.
Replan the queue around work already underway.
FULL REPLANNING

Regenerative Run

  • Rebuild the complete queue, including machines under production.
  • Reset bay and slot allocations as part of the revised plan.
  • Use at initial CPC implementation or when a genuine production overhaul is needed.
  • Review the resulting allocations before putting the revised plan into practice.
Reassess the entire production arrangement.
CPC / Discrete production

Sandbox

Explore the alternatives. Confirm the commitment.

Run the plan manually or on a daily schedule. Adjust capacity, machine priorities or holds, then compare the forecast end date of every SO across scenarios. Confirm one option as the firm plan.

Interactive planning illustration · Sample data
Available MHA
640 h
Opening pending MHR
720 h
Capacity gap
80 h
Production order Base capacity Approved OT Transfer between bays
SO-101 · Assembly A 18 Nov 16 Nov 15 Nov
SO-102 · Assembly B 21 Nov 19 Nov 23 Nov
SO-103 · Assembly C 25 Nov 23 Nov 24 Nov

Base plan: the current workload exceeds available capacity in this illustrative planning window.

No illustrative scenario confirmed yet

Illustrative outcomes only—not a live scheduling calculation. Confirming here updates this page’s sample plan.

Manual or scheduled

Run when the planner needs an answer, or schedule a regular daily run.

Compare before confirming

Test overtime, manpower transfers, holds and changes in machine priority.

Auto Run + Auto Confirm

Configure Net Change to run and confirm automatically where the organization chooses this operating mode.

CPC / Discrete production

Overtime Planning

Add approved capacity. Then reassess delivery.

Identify the gap

Review MHR versus MHA for the day or forecast week.

Request overtime

Specify people, hours and the from/to dates and times.

Approve the hours

Only approved overtime contributes to available MHA.

Run and confirm

Recalculate through Net Change and confirm the revised Sandbox plan.

Calendar and Bay Loading views then reflect the confirmed capacity and completion forecasts.
CPC / Discrete production

Manpower Allocation

Move capacity where it matters. See the trade-off.

Temporary transfers between bays

Respond to an urgent machine by deploying manpower from one bay to another. CPC reflects the reduction in source-bay capacity and the increase in the receiving bay.

The receiving work can accelerate while the source work slows. Compare both effects in Sandbox before choosing the plan.

Illustrative transfer · Total capacity unchanged
Bay A · Source− 40 hLess capacity available
Bay B · Recipient+ 40 hMore capacity available
Source bay→Eligible team→Urgent load

The forecast must reflect both sides of the decision.

CPC / Discrete production

Bay Loading & Capacity Calendar

One confirmed plan. Two practical views.

Bay Loading / Where

Floor 1 · Bay A

75%SO-101
Slot 01
48%SO-102
Slot 02
25%SO-103
Slot 03
OpenSlot available
Slot 04

See the SO in each slot, completion rings, empty slots and bay-level MHA/MHR.

Sample view · No illustrative plan confirmed

Capacity Calendar / When

Weekly load against capacity

Week 1
Within MHA
Week 2
OT review
Week 3
Within MHA

View SOs by planned start or forecast FG date, with weekly MHA/MHR comparisons.

Sample view · No illustrative plan confirmed

An empty slot is usable only when the machine type, bay capabilities and required manpower make the allocation feasible.
CPC / Discrete production

Production Monitoring

Today’s completed work becomes tomorrow’s planning reality.

Record completion by subassembly

Update completed SAs against each SO every day. Completion percentage and MHC establish the remaining workload for the next morning’s run.

Daily completion→Opening pending MHR→Revised end dates
Illustrative production ticket

SO-104 · Machine assembly

Total MHR
300
Completed MHC
180
Pending MHR
120
60% complete · Remaining work feeds the next run
CPC / Discrete production

Downtime & Production Exceptions

Understand the causes without counting the delay twice.

01

Downtime reporting

Record material, quality, engineering and other downtime causes against the machine to explain lost progress.

02

Absenteeism

Apply the historical absence allowance upfront in MHA. Record daily excess absenteeism for review and analysis.

03

Holds & priorities

Hold or resume a machine, or bring planned work forward or move it back. Evaluate the revised queue in Sandbox.

Actual progress drives the forecast. Reduced daily completion already leaves more pending MHR. Recorded downtime and excess absence explain the shortfall; they do not separately add the same delay again.
CPC / Discrete production

ERP Integration

Choose where production is managed. Keep capacity planning connected.

ERP-LED PRODUCTION

Build on your ERP records

Use ERP production orders with SA breakdowns and route-hour masters. Record daily production completion in ERP.

New SOs + Completion→CPC

CPC reads the updates, computes opening pending MHR and forecasts against its configured resources and constraints.

CPC-LED PRODUCTION

Manage production within CPC

When the ERP does not provide the required production detail, configure the SA structure and route hours and record daily completion directly in CPC.

Production Tickets, capacity planning, daily monitoring, downtime and management review remain together in the module.

The operating model can fit the OEM’s existing systems. Reliable route hours, current completion records and accurate floor allocations keep the forecast meaningful.
CPC / Discrete production

Production MIS & Daily Review

Turn the forecast into decisions and accountable action.

A planning meeting with a common view

Review expected monthly completions and the invoice value of those machines. Examine delays and their causes, then assign specific actions to departments against each SO.

Track those actions through completion, keeping the discussion tied to the machine and the delivery outcome.

Illustrative daily review
Monthly FG forecast
12
Invoice value
₹2.4cr
Actions open
3
SO-101SCM · Material follow-upIn progress
SO-102Engineering · Drawing releaseCompleted
SO-103Quality · InspectionAssigned

Sample values and actions for illustration.

CPC / Discrete production

Constraint-based Production Capacity

A complete daily planning cycle.

Configure the factory. Load the demand. Compare the alternatives. Confirm the plan. Measure the progress. Reassess tomorrow.

From machine-level route hours to team movement, from overtime approval to monthly completion forecasts—Falco CPC connects planning and production reality in one working cycle.

Masters→Production orders→Sandbox→Confirmed loading→Daily review
Explore the Sandbox ↑ Review planning foundations ↑